30 years in Kuwait

Drainage and main sewer lines

Drainage is the first thing laid in a house and the last thing you want to break open. We lay underground lines before the slab with correct falls, install manholes and main sewers up to the public connection, and water-test every line before it is covered, under your engineer’s supervision.

What is included

  • Bathroom and kitchen drainage
  • Main sewer lines
  • Manholes and covers
  • Connection to the public network
  • Rain and roof drainage
  • Water test on every line before covering

When to call us

  • A new plot before the slab
  • A building or complex under construction
  • Replacing drainage in an older home
  • Repeated blockages from wrong falls

Why us

30 years in Kuwait

Our own licensed contracting team, with plots and buildings across every area of Kuwait.

Built to code

Correct falls, approved pipes and fittings, and a pressure test on every line before it is covered.

Under your engineer

We work under the owner’s approved engineer and hand over each stage once it is signed off.

Guaranteed handover

Handed over to the highest engineering standards, with the guarantee written into the contract.

From drawings to handover

Priced from the drawings, and every stage is checked with your engineer before the next.

  1. 1

    Send us the drawings

    Plumbing or architectural drawings on WhatsApp, or we visit the plot.

  2. 2

    A detailed quote

    Clear items for materials, labour and each stage, before we start.

  3. 3

    Work alongside the build

    Underground drainage before the slab, then supply, tanks and finishing, coordinated with the main contractor.

  4. 4

    Testing with your engineer

    Pressure tests on supply and water tests on drainage, signed off by your engineer before covering.

  5. 5

    Handover and guarantee

    We hand over the work and the as-built drawings, with a written guarantee.

Request a quote

Fill in your details and WhatsApp opens with the message ready. Attach a photo of the drawings.

We reply with a time slot and an estimate. You can send a photo or video of the problem in the same chat.

Questions

When should drainage start?

Before the floor slab, so lines go in at the right falls and are tested before covering.

Do you connect to the public network?

Yes, up to the connection point shown on the approved drawings.

Do you start from the beginning of the build?

Yes, from the underground drainage before the slab through to final handover.

How do you price the work?

From the drawings. Send them on WhatsApp or we visit, and you get a detailed itemised quote.

Across every area of Kuwait

Other contracting services

Priced from the drawings

Water supply and tank networks

Supply from the meter to the tanks, ground and roof tank networks and pumps.

  • Meter to ground tank supply
  • Ground and roof tank networks
  • Pumps and rising mains
Priced from the drawings

Main water distribution networks

Distributing water to every floor and flat in buildings and complexes.

  • Main lines for the building or complex
  • Distribution to floors and flats
  • Main and branch valves

Got a problem? Send us a photo

We reply with a time slot and an estimate. On time, guaranteed.